ASSEMBLY
1900 07/11 Assembly Section 3-6
© 2011 Alamo Group Inc.
ASSEMBLY
• .Fit the machine to top link (Optional Top Link
available).
• Raise machine on tractor linkage until the tractors
PTO and the machines gearbox stub shaft are
approximately in line.
The four levers of machine controls
must be operated from the tractor seat. During this operation ensure no one is standing on
or among the linkage arms or bars. Set tractor hydraulics to position control. Never allow
anyone below the frame unless it is securely blocked up.