Alamo 1900 Lawn Mower User Manual


 
ASSEMBLY
1900 07/11 Assembly Section 3-4
© 2011 Alamo Group Inc.
ASSEMBLY
DEALER SETUP INSTRUCTIONS
1. The machine will be delivered in a partially
dismantled condition, secured with transport
strap and banding.
2. Choose a firm level site.
3. Remove the transport strap, banding straps
and loose items.
4. Fill tank with oil from the chart or equivalent.
5. Raise the machine using overhead lifting
equipment with a minimum capacity of 1500kg
SWL. LEAVE IN POSITION AT THIS STAGE.
6. Lower the legs and pin in position selecting
the holes that position the machines gearbox
stub shaft approx. 75 mm below the tractors
P.T.O. shaft.
Note: Leg pin position used.
7. Unbolt stabilizer from machine and remove
the stabilizer nose quadrant pin.