Instale las tuberías de plomería (cont.)
Con una abrazadera para tubo, sujete las líneas de suministro a la estructura de
postes de madera.
Instale las válvulas de la ducha según las instrucciones del fabricante. No instale
la guarnición en este momento.
4. Position the Bath
CAUTION: Risk of product damage. Do not lift or move the bath by the apron or
apron braces. Verify that the apron braces are attached before installing the bath, then
lift the bath by the rim at multiple points.
NOTE: Keep a liner or drop cloth in place in the bottom of the bath until
construction is complete.
Install the drain and overflow assembly to the bath according to the drain
manufacturer’s instructions.
NOTICE: Squeaking may develop if the bath is installed over a subfloor other than
plywood. In order to prevent squeaking, place a pad between the bath and the
subfloor and positioned under the bath supports. We recommend that the pad be
made of spun bonded polyester landscape fabric or spun bonded house wrap
material. Do not use roofing felt.
NOTICE: Do not remove the clips that are attached to the bath. The clips are
required to ensure proper installation of the walls.
Position the pad under the bath supports.
Position and adjust the bath until its outside edge is flush with the framing.
Verify that the bath is level.
Vérifier que la baignoire est nivelée.
Verifique que la bañera esté a nivel.
Shim if necessary.
Caler si nécessaire.
Utilice cuñas si es necesario.
Studs
Montants
Postes de madera
1065823-2-C 18 Sterling