Land Pride SC2672 Brush Cutter User Manual


 
27
Section 5: Maintenance & Lubrication
1/07/09
SC2660 & SC2672 Skid Steer Rotary Cutter 326-025M
Land Pride
Table of Contents
Gearbox (SC2672 Only)
Unscrew vent plug with dipstick. Wipe oil from dipstick and
screw it back in without tightening. Unscrew again and
check oil level mark. If low, fill through top plug hole with
EP 80-90Wt oil until oil reaches full mark. Reinstall vent
plug with dipstick and tighten.
Type of Lubrication: Gear Lube EP 80-90W
Quantity = Fill until oil reaches full mark on dipstick.
IMPORTANT: Do not overfill! Level cutter and wait for
gearbox oil to cool before checking. An unlevel cutter or
a gearbox with hot oil will not show correct oil level.
8
Hrs.
SC2672 Gearbox Lubrication
23582
Do Not
Overfill
IMPORTANT: Your cutter is shipped with the
gearbox vent plug with dipstick packaged in the
Operator’s Manual bag and should have been
installed in the gearbox by your Land Pride dealer.
Please see your Land Pride dealer if the vent plug
with dipstick was not included.
SC2660 Spindle Hub Lubrication
Motor Spindle Hub (SC2660 Only)
The motor spindle hub (#1), has two cavity plugs (#2)
located on the hitch side of the hub housing.
1. Disengage blade hydraulics. Make sure blades have
come to a complete stop.
2. Disconnect float chains from cutter deck at mounting
holes “A” (See Figure 2-3 on page 16).
3. Disconnect height adjustment safety chain from front of
loader (See Figure 2-3 on page 16).
4. Raise front of cutter off the ground and tilt hitch forward
until cutter is hanging from the hitch straight down.
5. Set park brake, shut engine off and remove switch key
before continuing.
6. Remove one of the cavity plugs (#2) to check fluid level.
Fluid level should be within 1/2" from top of port opening.
7. Add EP 80-90 weight gearlube as required. Full capacity
of motor housing is approximately 1/3 pint.
8. Install cavity plug and tighten.
9. Being careful not to damage the tail wheel, lower cutter
back to ground level.
10. Reattach adjustment safety chain and float chains.
8
Hrs.