Aquatic LuxeAir Series Hot Tub User Manual


 
Aquatic Industries, Inc.
6
WARNING: All units are shipped with loose unions. Before attempting to test, install or use your whirlpool, all pump
and heater unions and “O” rings must be repositioned and/or tightened.
PLEASE NOTE: THE MANUFACTURER ACCEPTS A 1/4” VARIANCE. THERE ARE VARIATIONS ON EACH TUB
AND SPECIFICATIONS ARE SUBJECT TO CHANGE AS WE IMPROVE UPON OUR PRODUCT AS REQUIRED.
THE DIMENSIONS NEEDED FOR SITE PREPARATION AND STRUCTURE BUILDINGS SHOULD BE
MEASURED FROM THE TUB; AQUATIC INDUSTRIES, INC. ASSUMES NO RESPONSIBILITY FOR
PREPARATORY WORK.
Note: A good knowledge of construction techniques, plumbing and electrical installation according to codes are
required for proper installation. We recommend that a qualified licensed contractor perform the installation of all
Aquatic products. Our warranty does not cover improper installation related problems.


do not install the bath.
2. All baths are filled with water and operated in our manufacturing facility prior to shipment. Inspectors ensure watertight

DAMAGE OR DEFECT TO THE FINISH CLAIMED AFTER THE BATH IS INSTALLED
IS NOT COVERED UNDER THE WARRANTY.
TO INSPECT:
3. Place the tub in an area where it may be drained after testing.
4. Fill the tub with hot water (approximately 100
0
F) to the overflow and allow to stand for a few minutes. Carefully
inspect all fittings and connections for leaks.
5. Plug in pump and blower cords and run pump for 10 minutes.
 
 
do not install the bath.
8. Check to ensure that your installation will conform to all applicable codes and secure necessary permits. All electrical
and plumbing connections should be made by qualified electricians and plumbers.
DAMAGE OR LEAKS CLAIMED AFTER THE BATH IS INSTALLED ARE NOT COVERED UNDER THE WARRANTY.
WARNING: FAILURE TO FOLLOW THESE INSTRUCTIONS DURING INSTALLATION WILL RESULT
IN TERMINATION OF THE WARRANTY:


DO NOT MAKE ANY ALTERATIONS, ADDITIONS, OR DELETIONS TO THE
WHIRLPOOL SYSTEM, PUMP OR BATH.
WARNING: Whirlpool pump and piping are factory assembled. Relocation of pump or other modifications could adversely


QUIETNESS OF OPERATION:

operating quietness. Please ensure the following:


 Insulate the tub surrou
the blower and pump must be clean and free of any foreign matter.

INSTALLATION
INSTRUCTION GUIDELINES
READ ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLATION
PRE-INSTALLATION PROCEDURES: