Aquatic Industries, Inc.
12
BONDING WIRE: Connect a #8 bare copper bonding wire from the pump motor to the heater and
then to the cold water plumbing or other suitable ground. Grounding is required. Grounding is NOT
required for the blower.
BREAKER PANEL
15 AMP
2 POLE
GFCI
BREAKER
15 AMP
1 POLE
GFCI BREAKER
BLOWER
MAIN
HEATER
WHITE
RED
BLACK
GROUND
WHITE
BLACK
GROUND
INSTALLATION INSTRUCTIONS
ELECTRICAL INSTALLATION (continued):