Servis-Rhino 60/72 Brush Cutter User Manual


 
OPERATION
LJ60/72 02-02 Operation Section 4-15
OPERATION
© 2004 Alamo Group Inc.
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to manufacturer
recommendations. The following is a partial list of
items requiring inspection:
" Tire condition/air pressure
" Wheel lug bolts
" Steering linkage
" PTO shield
" SMV sign is clean and visible
" Tractor’s lights are clean and functional
" Tractor Seat belt is in good condition
" Tractor cab or ROPS is in good condition
" ROPS is in the raised position
" No tractor oil leaks
" Radiator free of debris
" Engine oil level and condition
" Engine coolant level and condition
" Power brake fluid level
" Power steering fluid level
" Fuel condition and level
" Sufficient lubrication at all lube points
" Air filter condition
8.1 Tractor Pre-Operation Inspection/Service
8.2 Cutter Pre-Operation Inspection/Service
Before each cutter use, a complete inspection and service is required to ensure the cutter is in a good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure the
cutter is ready for operation, conduct the following.
" Perform scheduled lubrication as detailed in the
maintenance section.
" Ensure all decals are in place and legible.
" Ensure driveline is securely attached to tractor.
Make sure the driveline yoke clamping cone is
securely seated in the grooves of the PTO shaft
and tightened.
" Inspect that the 3-point hitch pins are the proper
size, correctly installed, and secured to the tractor
lift arms with retaining pins inserted.