Jacuzzi J-DREAM II Outdoor Shower User Manual


 
7
Rough-in
WASHING
MACHINE
OUTLET
BOX
CONNECT #8 GAUGE
(10mm
2
) MINIMUM SOLID
COPPER BOND WIRE TO
THE HOUSE ELECTRICAL
PANEL OR APPROVED
LOCAL GROUND. AN
APPROVED GROUND MAY
BE AN 8 FOOT LONG
GROUND ROD (3 METER
LONG EARTH ROD), A
PLATE ELECTRODE, OR
OTHER ACCEPTABLE
BOND. CHECK YOUR
LOCAL BUILDING CODE
FOR REQUIREMENTS. (SEE
PAGE 22 FOR BONDING
INSTRUCTIONS).
ELECTRICAL OUTLET
3 WIRE 240V 20A
RATING TO BE ON A
GFCI PROTECTED
CIRCUIT
HOSE
BIBB (2)
(2) 1/2 " HOT
& COLD
WATER
SUPPLY
LINES
37
"
FINISHED
WALLS
2 " WASTE STUBOUT
21-1/2"
11-5/8"
FINISHED WALL
SURFACE
FINISHED FLOOR
MATERIAL
60"
FINISHED
MINIMUM
IMPORTANT: This is the installed position of
the waste stub-out when connected to the
shower drain. If the stub-out is installed before
the shower unit, leave enough flex in the waste
line to allow the end of the stub-out to be
blocked temporarily (see page 10) in a position
under flush to the floor surface. This will allow
the shower unit to slide across the floor into
position without having to lift it.
IMPORTANT: The shower drain is designed
to connect to a 2 inch (50mm) ABS or PVC (as
approved by local codes/standards) waste
stubout.
End of 2 inch (50 mm) waste stubout must be
located to these dimensions within 1/4 inch
(6mm).
40 "
55
"
FINISHED WALL
SURFACE
42"
J-Dream II Owner's Manual