Locate Base to provide assembly access to all sides
Remove Base from carton labeled Base/Top. Place Clear Top in carton to prevent damage. (The Clear Top will
not be installed until the unit has been fully assembled and plumbed).
Position the J-Dream base on the floor so that you have work access to all four sides of the unit during assembly.
(Allow a minimum of 24" (600 mm) of access on each side of base.) Before starting assembly, position the base
pointing in the same direction as it will be in the final installation position so no unnecessary turning of the unit is
required.
J-Dream II Owner's Manual
Base
Drain Fitting
Floor cut-out
for drain pipe.
Notice Base is positioned in the
same direction as it will be in
the final installation position.
Niche where J-Dream II
is to be finally installed.
RubberWasher
Silicone
Sealant
Flange