Invacare IH6300 Hot Tub User Manual


 
SECTION 4—INSTALLATION
Supine Bath Tub 18 Part No 1096926
Securing the Tub
NOTE:Forthisprocedure,refertoFIGURE 4.1onpage 17andFIGURE 4.2.
1. Setthetubinplace.
2. Marklocationofanchorholes,usingpredrilledholesinlegmountingpadsasa
template(Detail“A” ofFIGURE 4.1).
3. Movetubawayfrommountingarea.
ƽ WARNING
Protective eye wear MUST be worn when drilling to avoid possible eye injury.
4. Drillanchorholesinfloor.Useajackdrillwithacarbidebitforconcretefloorsora
woodbitforwoodfloors.
5. Repositionthetubinmountingarea,aligningtheholesinthelegmountingpadswith
theholesdrilledinSTEP4.
ƽ WARNING
DO NOT adjust height of legs more than 1 inch (25.4 mm); leg will disassemble
from leg mounting pad and serious injury may occur.
6. Levelthetubbyadjustingthetelescopiclegseitherupordown,usingawrench,to
achievethedesiredheight.
7. Checktomakesuretubislevelbyplacingalevelonthefrontandsidesofthetub
(Detail“A ”ofFIGURE 4.2).
8. RepeatSTEPS6and7untiltubislevel.
9. Securelegstofloorusingfastenersappropriateforthefloormaterialandinkeeping
withlocalcodes(Detail“B”ofFIGURE 4.2).
FIGURE 4.2 Securing the Tub
DETAIL “A” - LEVELING
Level
Level
Leg
Leg Mounting
Pad
Anchor
1-inch (25.4 mm)
Maximum Adjustment
DETAIL “B” - SECURING TUB
Lag Bolt
Leveling
End to End
Leveling
Side to Side
Lag Bolt
Anchor