Cellboost 999-823 Utility Vehicle User Manual


 
3-19
Pre-Start Inspection and Operation
10. When all trenching has been completed, raise the trencher boom out of the trench and move
the trencher out of the way.
When the trenching has been completed, move the engine throttle to the idle position and allow
the engine to cool off at idle for 3 - 4 minutes.
11. Lower the trencher boom to the ground.
12. Shut off the engine and clean the trencher chain, tracks, and operator's platform of dirt and
mud.
NOTICE