Zenoah PSJ2300 Pole Saw User Manual


 
13
English
5. Set up
MOUNTING ENGINE (SE1)
1. Push the driveshaft housing
toward the clutch housing and
rotate it by hand to check that the
driveshaft is engaged with the
gears.
2. Insert the driveshaft housing into
the clutch housing until it bottoms,
and align the positioning holes on
the both housings and install the
screw.
3. Fasten the clamp securely with 2
screws.
CONNECTING THROTTLE WIRE
1. Remove the air cleaner cover.
2. Connect the end of the throttle
wire to the joint on the top of the
carburetor. (SE2)
CONNECTING SWITCH WIRES
(SE3)
Connect the switch wires between
the engine and the main unit.
Fix the switch wire like figure of
SE3.
The space between a tank and
switch wires is 3mm or more.
(1) 3mm or more
INSTALLING HANDLE (SE4)
Install the handle to the shaft tube
and clamp it at a location that is
comfortable to you.
(1) About 48cm
JOINT ATTACHMENT (SE5)
Insert the attachment to the main
shaft.
Tighten the knob bolt securely.
(1) Knob bolt
SE1
SE2
SE3
SE4
(1)
SE5
中 文
■安装引擎(SE1)
1. 将驱动轴罩推向离合器罩,并用手旋
转以检查驱动轴是否与齿轮啮合。
2. 将驱动轴罩插入离合器罩直至底部,
然后使两个罩上的定位孔对齐,装上
螺钉。
3. 用2个螺钉紧固夹具。
■连接加油线
1. 拆下空气滤清器的盖子。
2. 将加油线的一端连接至化油器顶部
的接头上。(SE2)
■连接开关线(SE3)
・连接引擎和主机之间的开关线。
・如图SE3所示固定开关线。
・燃料箱和开关线之间的距离应为
3mm或以上。
(1)3mm或以上
■安装把手(SE4)
・将把手安装到轴管并夹紧在您觉得适
合的位置。
(1)约48cm
■接头连接(SE5)
・将接头插入主轴。
・坚固旋钮螺栓。
(1)旋钮螺栓
5 安装