Genie Z-45, Z-25J Utility Vehicle User Manual


 
Part No. 82595 Genie Z-45/25 DC & Genie Z-45/25J DC 25
Operator's ManualSecond Edition · First Printing
Observe and Obey:
The transport vehicle must be parked on a level
surface.
The transport vehicle must be secured to
prevent rolling while the machine is being
loaded.
Be sure the vehicle capacity, loading surfaces
and chains or straps are sufficient to withstand
the machine weight. See the serial plate for the
machine weight.
The machine must be on a level surface or
secured before releasing the brakes.
Be sure the turntable is secured with the
turntable rotation lock before transporting. Be
sure to unlock the turntable for operation.
Free-wheel Configuration for
Winching
1 Chock the wheels to prevent the machine from
rolling.
2 Release the non-steer wheel brakes by turning
over the drive hub disconnect caps.
3 Be sure the winch line is properly secured to the
drive chassis tie points and the path is clear of
all obstructions.
After the machine is loaded:
1 Chock the wheels to prevent the machine from
rolling.
2 Apply the non-steer wheel brakes by turning
over the drive hub disconnect caps.
Towing a Genie Z-45/25 DC or a Z-45/25J DC
machine is not recommended. If the machine must
be towed, do not exceed 2 mph / 3.2 km/h.
Transport and Lifting Instructions
Disengage
Position
Engage
Position