18. Attach front edge rail to frame. (Figure 14)
19. Install top support over curtain and frame.
(Figure 16) Note that pawl must be inserted into place
10 - 30 mm
30 -10.5 - 3 mm
10 - 40 mm
10 -30 mm
30 -10.5 - 3 mm
before inner end of support is bolted to the upright
bracket. (Refer to Figures 5 & 11) Fasten curtain to
frame with bolts and flat washers as shown. (Figure 16)
54
Figure 14
Figure 15
Outer
End Rail
Outer End
Lower Rail