Front Support Leg
Apply Grease At Contact Points
Figure 4
7. Fasten curtain frame upright bracket to gear-
box using (3) 12 x 30mm bolts, and (1) 12 x 40mm
bolt. The 12 x 40mm bolt is located in the bottom
rear hole. Leave this bolt loose as it will be used to
fasten other components together. (Figure 5)
12 -30 mm (3)
(Also Bottom Front - Not Seen)
8. At this point the bottom shipping frame should
be removed so as not to interfere with installation of
the gearbox skid and swathboard. Save the fasten-
ers removed from the bottom of the cutter bar as
they will be used later at the same location.
Figure 5 Pawl
Figure 6 Swathboard
12-40 mm
Skid
Figure 7 Skid Swathboard
Twisted Strut
9. Install gearbox skid, then gearbox swathboard
using the 12 x 40mm bolt that was left loose previ-
ously. Use two bolts at front to connect skid and
swathboard. (Figure 6) At the rear side of gearbox,
use twisted strut to connect skid and swathboard.
(Figure 7)
12 - 40 mm Plow Bolt 12 - 35mm Plow Bolt
10 x 25 mm
12 - 40 mm
49