SETTING EXERCISE TIMER
The Standby Generator is equipped with an exercise timer
that will start and exercise the generator once every seven
days. During this exercise period, the unit runs for
approximately 20 minutes and then shuts down. Electrical
load transfer DOES NOT occur during the exercise cycle
(unless an utility power outage occurs).
A switch on the control panel is labeled “Set Exercise” (see
page 7). On the specific day and time the switch is pressed,
the control board is programmed.This date and time is
then used to automatically initiate the generator exercise
cycle.
To perform the Set Exercise procedure:
1. Choose day and time you want Standby Generator to
exercise.
2. On that da
y and time, set AUTO/OFF/MANUAL switch
to OFF position.
3. Press and hold down “Set Exercise” switch for two
seconds.
4. Set AUTO/OFF/MANUAL switch to AUTO.“Set
Exercise” is complete.
For example, if you press the “Set Exercise” switch on
Sunday morning at 10:00 AM, the unit will run an exercise
cycle the following Sunday at 10:00 AM (+/- 1 hour).
NOTE: “Set Exercise” will only work if the unit is in the
Automatic mode and this exact procedure is followed.
If you want to change the day and time the unit exercises,
simply perform the “Set Exercise” procedure at the day and
time you want it to take place.
INSTALLATION
INSPECTION
Before placing the Standby Generator into service, inspect
the entire installation carefully. Ensure that any scratches or
broken paint on the inside or outside of the enclosure are
touched up with the supplied paint.
Complete the ”Installation Checklist” as you make the
inspection. Ensure all items have been filled-in and all
signatures have been obtained. Instruct the owner to mail
the white copy to:
Briggs & Stratton Power Products
Warranty Registration
P. O. Box 1144
Milwaukee,WI 53201-1144