Baldor BALDOR GENERATOR Portable Generator User Manual


 
10-3
ASSEMBLY PROCEDURES
10-3-1
FRONT
BRACKET
Install the front bracket on the main bearing cover of
the engine, engaging the faucet joint.
(See
Fig.
10-27.)
M8
X
18mm bolt and washer assy
-.***..-..-*
4pcs.
TIGHTENING TORQUE
10.1
ft
9
Ibs.
1175
-
1370N-crn
140
kg
=
cm
Fig.
10-27
10-3-2
ROTOR
1)
Wipe off oil from the tapered portion of engine shaft and matching tapered hole of rotor shaft.
(See Figs. 10-28 and
10-29.)
Fig.
10-28
Install rotor on the engine shaft and tighten the
through-bolt.
Apply a wrench on the head
of
through bolt and
hit
wrench handle clockwise with a hammer
to
tighten.
(See
Fig.
10-30.)
If
an impact wrench
is
available, use it.
I
TIGHTENING TORQUE
I
8.7
-
10.1
ft
Ibs.
1175
-
1370N-cm
120
-
140
kg
cm
I
Fig.
70-29
I
Fig.
10-30
-
42
-