14 Hydraulic Installation
MAN0064 (Rev. 7/20/2007)
1001420 Hose Kit
Install Hose Hanger
1. Install hose hanger bracket (8) under platform
between brake pedals and chassis as shown in
Figure 17.
2. Secure with hex head cap screw (10), flat
washers (11), and lock nut (12).
3. Route hoses through hose hanger bracket and up
behind right platform as shown in Figure 18.
4. Secure hoses in hose hanger with lock pin (9).
5. Secure hoses every 20 inches with plastic ties.
8. 58033 Hose hanger bracket
9. 58047 1/4 x 2-1/2 Lock pin
10. 6250 5/16 NC x 1-1/4 HHCS
11. 4378 5/16 Standard flat washer
12. 6778 5/16 NC Lock nut
Figure 17. Hose Hanger Installed
Figure 18. Hose Routing
Connect Loader Feedline Hoses
1. The control valve kit contains hoses assembled
with quick couplers. Attach the hoses to loader
feedlines, following the color pattern.
2. Connect loader supply hoses to control valve
hydraulic couplers when attaching loader.
Figure 19. Control Valve and 1020/1027 Loader Feedline Connections