Hydraulic Installation 13
MAN0064 (Rev. 7/20/2007)
1001420 Hose Kit
Install Hoses
1. Attach 90° end of hoses (7) to the IN, OUT and
PBY ports of the loader control valve.
2. Locate the fill plug on the top of right rear axle
and remove.
3. Install adapter (5) and elbow (6) into opening.
4. Attach hose from the PBY port on the loader
control valve to elbow (2) in the PBY (N) port on
the front of adapter plate (3).
5. Attach hose from the IN port on the loader control
valve to elbow (1) in the PRESSURE (P) port on
the side of adapter plate.
6. Attach hose from the OUT port on the loader
control valve to elbow (6) in the RETURN port on
the top of the rear axle.
1. 316004 Elbow, 3/4 JICM x 3/4 ORBM 90°
2. 313032 Elbow, 3/4 JICM x 3/4 JICF 90°
5. 1001419 Adapter, 7/8 O-ring F x 1-3/8 Trd M
or
5. 1001657 Adapter, 7/8 O-ring F x 1-5/8 Trd M
6. 60 Elbow, 3/4 JICM x 7/8 ORBM 90°
7. 1001422 Hose, 86" x 3/4 JICF x 3/4 JICF
Figure 15. Hose Connection at Adapter Plate
Figure 16. RETURN Port Connection
1
P
N
7
2
7
6
5
7