11
Tube Installation
CONNECTING UPPER & MIDDLE TUBE
1. Slide the upper tube (A, Figure 19) into cover (B)
aligning ridge (C) with cutout (D) as shown.
2. Slide middle tube (D, Figure 20) into upper tube (E).
3. Slide middle tube (D) over boot (A). Pull strap (B)
and place hole completely over pin (C).
4. Secure upper tube (E) over middle tube (D) and
secure tubes together using 1/4 x 3/4 screw (F) and
correct hole.
C
A
B
C
D
A
B
E
D
Figure 19. Install Upper Tube to Cover
A. Upper Tube
B. Cover
C. Ridge, Upper Tube
D. Ridge Cutout
Figure 20. Install Middle Tube
A. Lower Chute
B. Strap, Rubber
C. Pin
D. Middle Tube
E. Upper Tube
F. Screw, Phillips Head, 1/4 x 3/4
F
38” Free Floating
Mowers
42” & 38” Frame
Hung Mowers