PAGE 42 — DCA-400SSK — PARTS AND OPERATION MANUAL (STD)— REV. #3 (09/17/01)
General Inspection Prior to Operation
The DCA-400SSK generator has been thoroughly inspected
and accepted prior to shipment from the factory. However,
be sure to check for damaged parts or components, or loose
nuts and bolts, which could have occurred in transit.
Extension Cable
When electric power is to be provided to various tools or
loads at some distance from the generator, extension
cords are normally used. Cables should be sized to allow
for distance in length and amperage so that the voltage
drop between the generator and point of use (load) is held
to a minimum. Use the Cable Selection Guide (Table 10)
as a guide for selecting proper cable size.
Circuit Breakers
To protect the generator from an overload, a 3-pole,1000
amp,
main main
main main
main
circuit breaker is provided to protect the UVW
output terminals from overload. In addition two single-pole,
20 amp
GFCIGFCI
GFCIGFCI
GFCI
circuit breakers are provided to protect the
GFCI receptacles from overload. Three 50 amp
loadload
loadload
load
circuit
breakers have also been provided to protect the load side of
the generator from overload. Make sure to switch
ALLALL
ALLALL
ALL
circuit
breakers to the "OFF" position prior to starting the engine.
DCA-400SSK — PRE-SETUP
ALWAYS consult with a licensed
electrician for correct extension
cord wire size.
NOTE