BODEGA BAY WOOD INSERT
Page 20
August 20, 2008
R
435-1320B
1
1
2
2
3
4
4
4
4
4
4
4
4
4
4
6
6
4
4
5
2
6-1/8"
2-1/4"
5
5
Allen wrench
on retainer bolt
First tube has larger holes
BRICK REPLACEMENT INSTRUCTIONS
PART 832-3500
The rebox of your insert is lined with high quality re-
brick which has exceptional insulating properties. There
is no need for a grate, simply build a re on the rebox of
your insert.
1. Be certain coals are completely cold. Remove all old brick
and ash from unit and vacuum out rebox.
2. Remove new brick set from box and lay out to the diagram
as shown.
3. Lay bottom bricks in unit.
4. Install rear bricks on the top of the bottom bricks. Slide
top of bricks under clip on back of rebox wall and push
bottom of brick back.
5. Install side bricks. Slide top of brick under clips on side
of rebox and push the bottom of the brick until it is ush
with the side of the unit.
Nbr Brick Size Qty in Set
1 9 x 4-1/2 x 1-1/4” with hole 2
2 9 x 4 x 1-1/4” with cut 2
3 4-1/2 x 3 x 1-1/4” 1
4 9 x 4-1/2 x 1-1/4” 12
5 9 x 3 x 1-1/4” 3
6 9 x 1-1/2 x 1-1/4” 2
Use Part #832-0550 when ordering individual brick and
provide brick dimension or copy this page and mark the
desired brick and take it to your authorized dealer.
BAFFLE REMOVAL & INSTALLATION
NOTE: The bafe is 2700° Fiber Board. Removing hardware exposed to combustion processes can be frustrating. If your
reason for removing the bafe is to clean the chimney, you have alternatives which will save time and effort. Call a qualied
chimney sweep or an authorized Quadra-Fire dealer for details.
1. Remove all ash from rebox, and extinguish all hot embers before disposal into a metal container.
2. Remove ceramic blanket from above the bafe.
3. With a 3/16” Allen wrench, remove 2 front manifold tube retainer bolts on the air channel under the end of the front tubes. NOTE:
Soak the bolts with penetrating oil for at least 15 minutes before trying to remove them. See Figure 20A.
4. To remove manifold tubes, slide the tube to one side until one end is out of its hole. Then, while lifting that end of the ber
board bafe, pull tube up over the air channel and out of hole at the other end. It is necessary to remove the rst 2 tubes
in order to remove the bafe. NOTE: When replacing the manifold tubes, be sure the tube with the larger holes is placed
in the front for your insert to operate properly.
5. Slide ber board bafe forward to front of stove and straight out through door. See Figure 20B.
6. To install the ber board bafe, repeat steps 2 through 4 in reverse order. Be sure the ber board bafe and ceramic blanket
are pushed back fully into position and the ceramic blanket lays at.
Ceramic Blanket
Baffle
Figure 20B - Bafe & Ceramic Blanket on top.
Figure 20A - Manifold tubes in roof of rebox.