Generac Portable Products Power Transfer System
13
OPERATING PROCEDURE
This manual section describes the routine procedures
used by the owner to operate the Power Transfer
system.
Each Load Manager switch is equipped with six
three-position switches. The switch positions labeled
LINE are used for connecting the desired devices to
the utility power source. The switch positions labeled
OFF are used for load management. The switch
positions labeled GEN are used for connecting
desired circuits to the generator power source.
Switch To Generator Power
To switch to generator power after a utility power
failure:
1. Ensure all Load Manager switches are in LINE
position, as shown in Figure 18.
2. Align the female socket of the connecting cord set
with the connection box receptacles mating male
prongs, as shown in Figure 19. Push cord set
connector in and twist clockwise to lock.
3. Align the male prongs on the other end of the cord
set with the mating female terminals of the
generators 50 Amp 240V receptacle, as shown in
Figure 20. Push connector fully into receptacle.
4. Ensure generator is outdoors and fuel is adequate.
5. Start the generator using instructions given in the
generator owners manual.
Figure 18 Switches in LINE Position
Figure 19 Connection Box Connection
Figure 20 Align Connector at Generator