Exmark Lazer Z HP Lawn Mower User Manual


 
12
22
21
4.2.4 Close and latch the door before continuing mowing. Do not engage the cutting
blades while the door is in the open position.
4.3 BAGGER REMOVAL FOR SIDE DISCHARGE:
4.3.1 Disengage the PTO, stop engine and wait for all moving parts to stop. Remove
spark plug wire(s) or remove key.
4.3.2 Remove the discharge tube by releasing the latch at the blower. Slide the tube
off the blower outlet and remove the upper end from the hopper.
4.3.3 Remove the Belt cover by loosening the knobs.
CAUTION
POTENTIAL HAZARD
The deck sheave will become very hot
WHAT CAN HAPPEN
Touching a hot deck sheave can cause severe burns.
HOW TO AVOID THE HAZARD
Allow the deck sheave to cool completely before
removing the belt.
4.3.4. Pull the idler release handle and remove the belt from the upper groove of the
deck sheave.
4.3.5. Unlatch the front end of the blower. Pivot the blower back and lift it off the deck.
4.3.6. Install the discharge chute using the chute pivot pin and hairpin (See Figure 10).
FIGURE 10
DISCHARGE CHUTE INSTALLATION
4.3.7. Re-install the plastic belt cover and tighten the knobs.
4.3.8. Remove the hair pins and clevis pins holding the hopper assembly to the mount
weldment.
4.3.9. Lift the bag hopper assembly off the mount.
4.3.10. Remove the hairpins and lift the front weight(s) off of the mount plates.
Note: The portions of the Ultra Vac QDS bagger that are not bolted to the mower
are designed to be installed or removed in their entirety. Do not operate the
mower with only a portion of the Ultra Vac QDS installed.
4.3.11. The machine can now be used for side discharge mowing.
4.4 TRANSPORTING
4.4.1 Transporting a Unit: Use a heavy-duty trailer or truck to transport the machine. Lock
brake and block wheels. Securely fasten the machine to the trailer or truck with
straps, chains, cable, or ropes. Be sure that the trailer or truck has all necessary
lighting and marking as required by law. Secure a trailer with a safety chain.