Electrolux OHV Snow Blower User Manual


 
8
9
CONSUMER ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the
spring as shown.
1. Slide rubber sleeve up rod and hook end of spring into
control arm with loop opening up as shown.
2. Remove retainer spring from top end of rod.
3. With top end of rod positioned under right side of control
panel, push down on rod and insert end of rod into hole
in auger control bracket. Secure with retainer spring.
INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD
(See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Position chute rotater head over chute bracket. If nec-
essary, rotate chute assembly to align square and pin
on underside of chute rotater head with holes in chute
bracket.
3. With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
4. Install 3/8 washer and locknut on threaded stud and
tighten securely.
TRACTION
DRIVE CON-
TROL ROD
DRIVE
CONTROL
BRACKET
RETAINER
SPRING
TRACTION DRIVE
CONTROL LEVER
AUGER
CONTROL
LEVER
AUGER
CONTROL
ROD
AUGER
CONTROL
BRACKET
RETAINER
SPRING
FIG. 4
FIG. 6
AUGER CON-
TROL ROD
CONTROL
ARM
RUBBER
SLEEVE
LOOP
OPENING
UP
FIG. 5
CHUTE RO-
TATER HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD
MOUNTING
BRACKET
CHUTE
BRACKET
FIG. 7
For Husqvarna Parts Call 606-678-9623 or 606-561-4983
www.mymowerparts.com