Electrolux OHV Snow Blower User Manual


 
32
33
Section 7.18: Replace Speed Control Linkage or
Speed Control Assembly
1) Check for proper linkage adjustment in
Section 6.24 before replacing part.
2) Remove control panel (see section 7.11 )
Section 7.19: Remove and Replace Power
Steering Control Cable
1) Remove fuel from fuel tank
2) Position blower auger end down.
3) Remove klik pin that secures wheel,
4) Remove wheel
4) Remove the two 5/16" hex head screws
holding control to handle assembly.
5) Reverse process to install a new linkage
and perform adjustment in Section 6.24.
3) Remove retainer spring from both ends of
linkage.
9) Remove 5/16" screw that secures trigger to
handle.
10)Reverse process to install cable.
7) Remove spring and pin holding bellcrank.
8) Unhook cable from bellcrank. Remove
5/16" screw that secures trigger to handle.
Remove cable.
5) Remove hardware that secures the power
steering cover.
6) Cut wire ties that secure power steering
cable to handle, noting location of ties.
SCREWS
SPEED CONTROL
ASSEMBLY
POWER STEERING COVER
NUT &
WASHER
RETAINER
SPRINGS
BELLCRANK
PIN
CABLE
TURN TRIGGER
5/6" HEX HEAD
SCREW
5/16" SCREWS
For Husqvarna Parts Call 606-678-9623 or 606-561-4983
www.mymowerparts.com