Dynasty Spas Operator’s Guide • www.dynastyspas.com
9
SET-UP & DELIVERY GUIDELINES (CONT.)
It is the customer’s responsibility to acquire necessary permits and to
arrange for installation and hook up of the electrical power by a
licensed electrician.
NOTE!
3” Concrete Pad
Getting Ready For Delivery & Set-up Of Your New Spa
Electrical Requirements
• Your 220 Volt spa pack will require a double pole 50 amp dedicated
GFCI, ground fault circuit breaker.
• Extension cords are not to be used in conjunction with operation of the
spa. Low voltage damage could result, which is not covered by warranty.
• If you have any doubts, have your electrical system checked by a
licensed electrician.
5’Minimum