Getting Ready For Delivery & Set-up Of Your New Spa
Surface And Pad Requirements
Your new portable spa must be placed on a uniformly firm, flat, and
level surface. A concrete pad 4 inches thick is best.
If your spa is located near sprinklers, adjust or cap them so they
do not hit the siding of the spa.
Balconies And Deck Requirements
Decking must be constructed to support 85 pounds per square
foot.
Balconies must be constructed to meet current state and local
codes.
Gates must be self-closing and self-latching.
Access & Clearance
Your spa requires from 37” (non stereo) to 41” (stereo) of
clearance through gates between house and side fences, and up
to 8.5' overhead clearance depending on the size of the unit.
The clearance required to turn a corner can be equal to the length
of the spa.
All debris blocking access to the job site must be removed prior to
delivery. Any trimming of trees or bushes, removal of debris,
leveling of ground or other general maintenance must be done
prior to delivery and is the responsibility of the customer.
Set-up And Delivery Guidelines