4
CROSSBAR MOUNTING BRACKET INSTALLATION
JOIST
CEILING
WIRING
CROSSBAR
MOUNTING
BRACKET
FLAT
WASHER
GREEN
GROUND
WIRE
CEILING FAN
APPROVED
WIRING BOX
RIDGE
SIDE
DOWN
APPROVED OUTLET
BOX
HARDWARE
box to insure that it is supported by a joist or beam
across its upper surface. If not, a 2” x 4” stud must
be installed.
Step 1. Remove the knockout plug in the center of the
outlet box or drill a
1
/2″ hole for the lag screw to pass
through. Then drill a
1
/4″ guide hole into the joist or beam
to a depth of 3″.
Step 2. Route the outlet box wires through the keyhole
slot of the crossbar mounting bracket as shown. Attach the
crossbar mounting bracket to outlet box with screws pro-
vided, assuring that the outlet box wires are not pinched
by the washer.
CAUTION: To reduce the risk of personal
injury, use only the mounting hardware pro-
vided with the approved outlet box to install
the crossbar mounting bracket.
CEILING HARDWARE
WIRE NUT (4)
ADDITIONAL HARDWARE
2
1
/4” x 8-32 ROUNDED
HEAD SCREW (2)
FLAT WASHER
(2)
1” x 8-32 ROUNDED
HEAD SCREW (2)
SUPPORT INSTALLATION PARTS
LAG SCREW
3
/
8
” #7 X 5” (1)
LARGE
FLAT WASHER
3
/
8
” (1)
WARNING!
SUPPORT DIRECTLY TO
BUILDING STRUCTURE
ONLY.
CROSSBAR
MOUNTING
BRACKET