DEALER PREPARATION CHECK LIST
ZERO TURN
BEFORE DELIVERING MACHINE — The following check list should be completed.
Use the Operator’s Manual as a guide.
❒ 1. Engine has been serviced.
❒ 2. Battery fluid level is checked.
❒ 3. Low oil pressure warning buzzer checked for operation.
❒ 4. Kill switches checked for operation.
❒ 5. Assembly completed.
❒ 6. Gearbox filled with oil.
❒ 7. All fittings lubricated.
❒ 8. Hydraulic Reservoir filled with oil.
❒ 9. All shields in place and in good condition.
❒ 10. All fasteners torqued to specifications given in Torque Chart.
❒ 11. All decals in place and readable. (See decal page.)
❒ 12. Overall condition good (i.e. paint, welds)
❒ 13. Parking brake checked and adjusted, if necessary.
❒ 14. Steering checked and adjusted, if necessary.
❒ 15. Check tire pressure.
❒ 16. Operators manual has been delivered to owner and he has been instructed
on the safe and proper use of the cutter.
Dealer’s Signature
Purchaser’s Signature
THIS CHECKLIST T
O REMAIN IN OWNER’S MANUAL
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
3