Xantrex Technology power Inverter Stacking Portable Generator User Manual


 
3
Operation
Chapter 3, “Operation”contains information on startup and functional
testing procedures for series-stacked Sine Wave Plus inverters.
The following topics are covered in this chapter.
For this topic: See:
“Start-up and Testing” page 3–2
“Setting Changes” page 3–4