Sterling sse Compact Loader User Manual


 
Machine-Side Hopper Loaders
4-2 Assembly instructions
4.1. Unpacking
The loader is insensitive to shocks and can be
mounted directly onto the processing machine, on
a machine hopper, a drying hopper or a dosing
and blending unit.
The equipment is delivered as a complete
assembly.
Use the following procedure to prepare the
machine for assembly:
1. Unpack the equipment.
2. Remove the plastic stopper (A) from the
material inlet nozzle.
3. Open the access door (B) and remove the
adhesive tape from the dump valve.
F The controller must be freely accessible.
A
B
Figure 1: 2-liter model