Multiquip gbe/gbce Landscape Lighting User Manual


 

SETUP
1. Set the GBC/GBCE cart on a firm level surface where
there is enough space around the cart for the outriggers
to be deployed.
2. Insert the T-handle into the handle holder on the cart.
Tighten with the wing bolt. See Figure 4.
Figure 4. T-Handle Installation
3. Insert the mast into the mast holder and secure with
lever as shown in Figure 5.
Figure 5. Inserting the Mast Into Holder
4. For the GBCE, attach the extension pole to the top of
the mast as shown in Figure 6.
Figure 6. Extension Pole Attachment
T-HANDLE
HANDLE
HOLDER
WING
BOLT
WASHER
MAST
LEVER
HOLDER
EXTENSION
POLE
BOLT
5. Insert the balloon assembly into the mast. Tighten the
T-bolt securely. See Figure 7.
Figure 7. Installing the Balloon
6. Unsnap the three buttons on the bottom of the balloon
cover and unzip the cover. See Figure 8.
7. Remove the AC Power Cable from the inside pocket
of the balloon cover.
Figure 8. Removal of AC Power Cable from
Balloon Cover
8. Fold the balloon cover into itself and zip it up. See
Figure 9.
Figure 9. Folding Balloon Cover
T-BOLT
MAST
BALLOON
PROTECTIVE
COVER
ZIPPER
BUTTON
AC POWER
CABLE
FOLD PROTECTIVE
COVER INTO ITSELF
BALLOON
FULLY
EXPOSED
ZIPPER