Genie DPL-30S Utility Vehicle User Manual


 
Part No. 82799 Genie DPL Super Series 19
Operator’s ManualSecond Edition • First Printing
Setup
1 Position the machine directly below the desired
work area.
2 Connect to an appropriate power source:
DC models: Connect the battery pack.
AC models: Connect to a grounded 15A AC
power supply. Use a 12 gauge / 3.3 mm² 3-wire
grounded extension cord no longer than
50 feet / 13 m.
3 Insert the key and turn to platform control.
4 Pull out the red Emergency Stop button at the
ground controls to the on position. Be sure the
power light is on.
5 Install the outriggers and adjust the leveling
jacks to level the machine. Use the bubble level
to be sure the machine is level.
6 Be sure that all four interlock display lights at
the ground controls are on.
7 Pull down on the platform
guard rail locking handle
and rotate the platform
side guard rail to the
upright position. Be sure
the side guard rail locks
in place. Repeat for the
other side.
8 Pull the ladder lock pins
and rotate the ladder down. Be sure the ladder
locks in place.
9 Climb the ladder to enter the platform. Close and
latch the platform entry gate and the platform
end guard rail.
Emergency Stop
1 Push in the red Emergency Stop button at the
platform controls or at the ground controls to
stop the up function.
Platform Raise and Lower
1 Twist to release the red Emergency Stop button.
2 Push and hold the control activate button and
rotate the up/down switch in the desired
direction of travel.
OPERATING INSTRUCTIONS