Generac 00941-4 Portable Generator User Manual


 
34 Generac
®
Power Systems, Inc.
Section 3 – Post-installation Start-up Checks
IMPACT-36 plus II Recreational Vehicle Generator
3.5 INSTALLATION CHECKLIST
LOCATION AND SUPPORT
Generator is properly located.
Generator is properly supported.
Generator is properly restrained.
GENERATOR COMPARTMENT
Compartment construction is proper.
Holes/Openings are vapor-sealed.
Compartment size is correct.
Compartment is vapor-sealed.
Sound insulation is correct.
Floor cutouts are properly completed.
COOLING AND VENTILATING AIR
Airflow is adequate.
Air inlet opening is correct.
Compensate for restrictions.
Check that installation has been tested.
DIESEL FUEL SYSTEM
Fuel tank complies with all applicable codes.
Fuel system is properly installed and checked
for leaks.
EXHAUST SYSTEM
Exhaust system complies with all applicable
codes.
Exhaust system is properly and safely installed.
ELECTRICAL CONNECTIONS
Connections comply with local code requirements
and all National Electrical Codes.
Junction box is properly installed.
Wiring meets all standards.
All connections are correct.
Conduit is properly installed and sealed.
Generator is properly bonded to the vehicle.
BATTERY INSTALLATION
Recommended battery is installed.
Recommended cables are installed.
Cables are clean and tight.
Cables are connected properly.
Proper ventilation is provided.
Terminals are coated with anti-corrosion grease,
and terminal covers are positioned.
OPTIONAL ACCESSORIES
Check that remote start/stop panels (if used) are
installed properly.
Check that all other options and accessories (if
used) are installed properly.
POST INSTALLATION TESTS
Check that all tests are completed properly.
DATE OF INSTALLATION ____________________________________________________
NAME OF INSTALLER ______________________________________________________
SIGNATURE OF INSTALLER ________________________________________________