18
Note: The removable weight is heavy. Use care when lifting. Make sure
that you can hold the weight securely before lifting. Use caution when
positioning your hands so that you do not set the weight down on your
hands or fingers.
FIGURE 15
(All units with a ROPS)
Lazer Z units SN 440,000 and higher:
3.5.8 Locate the position of the mounting holes by aligning the template (P/N 103-5865)
on the front face of the floor pan as shown in Figure 16. Clamp the template in
place. Using a center punch, mark the positions of the holes on the floor pan. Flip
the template over and repeat step one on the other end of the floor pan face.
FIGURE 16
3.5.9 Drill 3/8” holes at the points marked.
3.5.10 Follow steps 3.5.6 through 3.5.7 for weight installation (See Figure15).
3.6 INSTALL THE REMOVABLE WEIGHTS
Note: The removable weights are heavy. Use care
when lifting them. Make sure that you can hold
them securely before lifting them. Use caution
when positioning your hands so that you do not set
them down on your hands or fingers.
3.6.1 Assemble the weight brackets (Item 33) to the
removable weights (Item 11) using the 3/8-16 square
head bolts (Item 34) and 3/8 whizlock nuts (Item 25).
3.6.2 Install the removable weight assemblies over the
caster arms. On 52 and 60 inch Lazer Z
machines one weight has a wide mounting bracket
and one has a narrow bracket. They will only fit
the machine one way. Weights for the 60 Lazer
XP and all 72s are interchangeable left and right.
3.6.3 Install a clevis pin (Item 19) and hairpin (Item
20) on each caster weight to retain them.
3.6.4 Tighten knob on weight assembly until the
weight is clamped securely to the caster arm.
FIGURE 17
REMOVABLE WEGHT
INSTALLATION
Align template along
these 3 edges.