Echo PE-200 Edger User Manual


 
POWER EDGER
OPERATOR'S MANUAL
21
LUBRICATION
Gear Housing
Level 1.
Tools Required: 13 mm wrench, grease gun P/N 91016, clean rag
Parts Required: Echo Lube
TM
8 oz. (P/N 91014) or Lithium Base
Grease
1. Remove plug (A) and grease gear housing. Do not over-fill.
2. Replace plug and tighten securely.
Drive Shaft
Level 1.
Tools required: 8 mm Open End Wrench, Cross Head Screwdriver,
Clean rag
Parts Required: ECHO
®
LUBE
TM
8 oz. (P/N 91014) or Lithium Base
Grease.
1. Loosen two (2) screws (A) and remove center locating screw (B).
Pull gear box and shield from drive shaft housing.
2. Pull flexible cable from the drive shaft housing, wipe clean and
recoat with a thin coating [15 ml (1/2 oz.)] of grease.
3. Slide the flexible cable back in the drive housing. DO NOT get
dirt on the flex cable.
4. Install the gear housing and shield assembly.
5. Tighten screws securely.
A
B
A