Install Motor Housing
1. Slide motor assembly between shredder center
channel and secure to the left side using two 1/2
NC x 1-1/4 carriage bolts (29) and flange lock nuts
(30).
2. Install 1/2 NC x 1 cap screw (31) and flat washer
(32) to the right rear hole of the motor housing and
secure with flange lock nuts (30).
3. Install 1/2 NC x 1-1/4 carriage bolt (29) and flange
lock nut (30) into the right front hole.
4. Raise motor housing to the bottom of the mounting
slots and torque hardware to 85 lbs-ft.
Figure 54. Motor Assembly Installed
Assembly Hoses
1. Attach male quick coupler (17) and adapter (16) to
the end of hose (15). Attach tee (12) to the
opposite end of hose.
2. Attach male quick coupler (17) and adapter (16) to
the end of second hose (15). Attach check valve
(14), nipple (13) and tee (12) to the opposite end of
hose.
NOTE: Make sure flow indicator arrow on the side
of the check valve (14) is pointing in the correct
direction. See Figure 55
3. Install check valve (14) and two nipples (13)
between the two tees (12).
NOTE: Make sure flow indicator arrow on the side
of the check valve (14) is pointing in the correct
direction.
4. Place hose assembly around center plate of
shredder and drape quick couplers over the front of
the shredder. See Figure 55 and Figure 56.
5. Make sure hose with check valve is on the right
side of the center plate.
Figure 55. Hose Assembly
6. Route hose (11) from the IN side of the motor
between shredder and rockshaft and attach it to
tee (12) on the left side of the center plate.
7. Route hose (11) from the OUT side of the motor
between shredder and rockshaft and attach it to
tee (12) on the right side of the center plate.
Figure 56. Hose Routing
31
30
29
DP1
Check
Valve
11
Center Plate
RETURN
PRESSURE
L
e
f
t
R
ig
h
t
DP2
11
IN
OUT