Assembly 33
MAN0680 (11/30/2007)
DUAL TAILWHEEL INSTALLATION
(OPTIONAL)
1. Attach dual tailwheel (1) to main frame (D) using
position A and desired height location as shown in
Figure 35.
2. Secure with cap screws (17) and hex nuts (18).
3. Torque hardware to 175 lbs-ft.
Figure 35. Dual Tailwheel Installation
CHECK CHAIN INSTALLATION
(OPTIONAL)
Check chains are used to carry the front of cutter at a
set height. See Figure 36.
1. Thread check chains (3) through check chain
bracket (2).
2. Attach lower end of check chain (3) to mast plate
(9) with bolt (6), washer (7), and nut (8).
3. Attach keyhole brackets (2) to each side of tractor
top link bracket (10) with bolt (4) and nut (5).
Figure 36. Optional Check Chain Assembly
1. Dual tailwheel
17. 5/8 NC x 2-1/2 HHCS
18. 5/8 Flange lock nut
A. Tailwheel pivot hole
D. Deck Main-Frame
2. Check chain bracket
3. 3/8 Chain, 32-link
4. 3/4 NC x 6 HHCS GR5
5. 3/4 NC Lock nut
6. 5/8 NC x 2-1/4 HHCS GR5
7. 5/8 Flat washer
8. 5/8 NC Hex nut
9. Mast Plate
10. Tractor top link bracket