Assembly Section 2-10
ASSEMBLY
CABLE CONTROL LEVER STAND (SCV ONLY UNITS)
Place the cable control bracket on the floor so that the bracket is 1-1/4” from the
right corner post of the cab and the edge of the door opening. Also the outer rear corner
of the bracket is 3 3/4” from the edge of the door. See image below. Be sure that the
location of the stand will allow the operation of all controll levers in the tractor and that
the door will not strike the stand when shut. Double check under the cab for cables and
wires that may be cut when drilling. And before drilling double check location of the
stand for proper placement of holes. Drill 3 holes to match control bracket and secure
with capscrews and nylock nuts noted in parts section.
The rubber boot under the rear window can be cut in a cross hair pattern and if
necessary the bottom cut through to allow it to slip over the cables and back into
position. These cables will be routed to the lift valve mounted on the valve mounting
plate, and should not have any sharp bends or kinks in them. Secure cables with zip
ties and apply RTV sealer in and around individual cables, inside and outside of the
cab for a water tight seal. Do not allow excess cable to hang unsecured on the
outside of the cab.