12
30SS, 36SS, 45SS
Rev: 12/21/2011
Assembly Instructions
Step 6: Drive Control
1. Locate the thin cable on the right side (standing from the operator position) of the snow blower.
2. Attach the cable to the threaded end under the drive control handle. The cable extension may need to be attached
to the bottom of the handle.
3. Screw clockwise to secure. Tighten lock nuts when correct tension is achieved.
4. The drive and impeller cables will be at correct tension when the cables are properly attached to the handles and
the cable has a 1 inch deflection to either side when pushed firmly with a finger as shown.
Step 7: Augers/Impeller Control
1. Locate the thin cable on the left side of the snow blower.
2. Attach the cable to the threaded end under the impeller control handle.
3. Screw clockwise to secure. Tighten lock nuts when correct tension is achieved.
4. The drive and impeller cables will be at correct tension when the cables are properly attached to the handles and
Correct amount of
deflection shown
Need Help With Assembly?
1-919-550-3221 ext. 158