Servis-Rhino 2160 Brush Cutter User Manual


 
OPERATION
2160 02/10 Operation Section 4-13
© 2010 Alamo Group Inc.
OPERATION
7.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be
repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020
7.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
Tire condition/air pressure
Wheel lug bolts
Steering linkage
PTO shield
SMV sign is clean and visible
Tractor’s lights are clean and functional
Tractor Seat belt is in good condition
Tractor ROPS is in good condition
ROPS is in the raised position
No tractor oil leaks
Radiator free of debris
Engine oil level and condition
Engine coolant level and condition
Power brake fluid level
Power steering fluid level
Fuel condition and level
Sufficient lubrication at all lube points
Air filter condition OPS-U-0030
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals. OPS-U- 0011