PAGE 32 — GLOBUG LIGHTING SYSTEM — OPERATION & PARTS MANUAL — REV. #3 (03/22/06)
Installation of Winch Cable
1. Route (pass) a new winch cable through the main mast
pulley
(Figure 37).
2. Route the winch cable around the
upper pulley
of
the third mast section from back to front.
3. Next, route the winch cable around the
lower pulley
of the third mast section from back to front.
4. Route the winch cable around the
upper pulley
of
the
second mast section from back to front.
CAUTION - Winch Cable Safety Stopper
When placing the second mast into the main mast (first), pinch
(squeeze) the pulley and pin with pliers (Figure 38) to hold the
stopper (cable latch). This will keep the cable stop latch from
being activated.
10.Route the tip of the winch cable (Figure 39) through the
eyelet retaining stud. Insert cable retaining screw at top
of stud and tighten.
Figure 38. Bypassing Cable Stop Latch
Figure 39. Connecting the Winch Cable to the Winch
5. Route the winch cable through the lower bracket of the
third mast section
6. Route the winch cable around the
lower pulley
of
the
second mast from front to back.
7. Continue pulling the cable and slide down the mast, be-
ing careful not to activate the cable stop latches.
8. Route the cable around the pulley of the first mast
.
9. Place the second mast into the main (first) mast. Next,
place the third mast into the second, and finally place
the fourth mast into the third.
Figure 37. Attaching the Winch Cable
GLOBUG LIGHTING SYSTEM — MAINTENANCE