GAW-135H DC WELDER/AC GENERATOR — OPERATION MANUAL — REV. #1 (06/23/04) — PAGE 25
6. If the engine has started, slowly return the choke lever
(Figure 13 ) to the
“OPEN”
position. If the engine has not
started repeat steps 1 through 6.
7. Before the generator is placed into operation, run the engine
for 3-5 minutes. Check for abnormal smells, fuel leaks, and
noises that would associate with lose components.
8.
Place
the
idle control switch
(Figure 13) in the "OFF"
(down) position. This will allow the engine speed to run
at speed about 3600 RPM's
10. If desired, verify with a voltmeter (Figure16) that 120
VAC is present at the GFCI duplex receptacle.
Figure 16. 120 VAC GFCI Receptacle
NOTE
Placing the
idle control switch
in
the RUN position (Figure 14) allows
the engine to operate at a maximum
speed of about 3600 RPM's. When
the idle control switch is placed in
the up position (ON), the generator
will run at idle speed (2200 RPM's) until a load is applied, at that
time the engine speed will increase to 3600 RPM's as long as
the load is being applied. When the load is not in use, the engine
speed will drop back to the idle mode after about 3 seconds.
GAW-135H — INITIAL START-UP/GENERATOR OPERATION
Figure 13. Idle Control Switch (Off)
Figure 14. Idle Control Switch (On)
Connecting the Load
1. If small wattage power tools are required, connect them
to the GFCI receptacle.
9. Place the main circuit breaker (Figure 15) in the ON
position.
Figure 15. Main Circuit Breaker (ON)