Multiquip DCA-125USJ Portable Generator User Manual


 
DCA-125USJ (50 HZ) — OPERATION AND PARTS MANUAL — REV. #0 (03/11/05) — PAGE 35
1
DCA-125USJ (50 HZ)— PRE-SETUP
Refueling Procedure:
1. Level Tanks – make sure fuel cells are level with the
ground. Failure to do so will cause fuel to spill from the
tank before reaching full capacity (Figure 33).
DANGER:DANGER:
DANGER:DANGER:
DANGER:
WARNING:WARNING:
WARNING:WARNING:
WARNING:
Figure 33. Only Fill on Level Ground
ONLY! use
#2 diesel fuel
when
refueling.
Diesel fuel
and its vapors are dangerous
to your health and the surrounding
environment. Avoid skin
contact and/or inhaling
fumes.
ALWAYS!
place trailer on firm level ground
before refueling.
NOTE
3. NEVER overfill fuel tank – It is important to read the
fuel gauge when filling trailer fuel tank. DO NOT wait for
fuel to rise in filler neck (Figure 35).
Figure 35. Full Fuel Tank
Figure 36. Fuel Expansion
WARNING:WARNING:
WARNING:WARNING:
WARNING:
DO NOT OVER-FILL fuel system. Leave
room for fuel expansion . Fuel expands when
heated (Figure 36).
3. Open cabinet doors on the “right side” of the generator
(from generator control panel position). Remove fuel cap
and fill tank (Figure 34).
Figure 34. Fueling the Generator