Land Pride 322-215M Spreader User Manual


 
8
Section 1: Assembly & Set-up
Model SBR48, SBR60 & SBR72 Seed Bed Roller 322-215M
2/23/09
Land Pride
Table of Contents
c. Attach back of tongue with two 3/8"-16 x 1" GR5
cap screws (#8) and 3/8" flange lock nuts (#15).
7. Tighten flange lock nuts (#14, #15 & #16) to the
correct torques.
8. Remove wire snap lock pin (#1B). Reorient ball
hitch (#6) and clevis hitch (#7) with preferred hitch
facing forward and then reattach hitch to tongue (#5)
with wire snap lock pins (#1A & 1B).
9. Attach support stand (#3) to wire snap lock pin (#1A).
When not in use, rotate stand up and secure in place
with second wire snap lock pin (#1B).
10. If clevis hitch (#7) is facing forward, insert 3/4" hitch
pin (#12) and secure with hair pin cotter (#13). If ball
hitch (#6) is facing forward, store hitch pin and hair
pin cotter in a safe location of your choosing.
Roller Scraper Assembly
Refer to “Torque Values Chart For Common Bolt Size”
on page 21 when tightening hardware.
Refer to Figure 1-4 on page 9:
1. Attach roller scraper assembly to the Seed Bed
Roller frame with 3/8"-16 x 1" GR5 round head
square neck bolts (#2) and hex flange lock nuts (#3).
2. Tighten nuts to the correct torque.
3. Some adjustment to the scraper teeth can be made
by loosening the nuts on scraper (#1). Retighten nuts
after adjustment has been made. See “Scraper Bar
Adjustment” on page 11 for detailed instructions.
NOTE: See Figure 1-3. Ball hitch (#6) and clevis
hitch (#7) can be installed with either hitch facing
forward. Determine which hitch you intend to use
and face that hitch forward.
Pull Type Hitch Assembly
With Drawbar 13" & Higher
Figure 1-2
Pull Type Hitch Assembly
With Drawbar under 13" High
Figure 1-3
25774
26518
Pull Type Hitch Assembly (Optional)
Refer to “Torque Values Chart For Common Bolt Size”
on page 21 when tightening hardware.
Refer to Figure 1-2 & Figure 1-3:
1. Chock front and back of rollers to prevent unit from
shifting. Support 2" square tube frame up so that the
top of the clevis plates are level.
2. Remove support stand (#3) and wire snap lock
pin (#1A) from the clevis plates (shipping location).
3. The front two holes in hitch frame (#4) should be
shipped from the factory attached to the front holes
in the clevis plates with hitch pins (#17) and linch
pins (#11). If not, make this pin connection now.
4. Rotate hitch frame (#4) down to align rear holes in
hitch frame with holes at the back of the clevis plates.
Insert 5/8"-11 x 1 1/2" GR5 carriage bolts (#10) and
secure with 5/8" hex flange lock
nuts (#16). Draw nuts up snug, do not tighten.
5. Remove 3/4" hex cap screws (#9), 2" spacer (#2) and
and 3/8" cap screws (#8) from hitch frame (#4).
6. Attach tongue (#5) to 3-point hitch (#4) as follows:
a. Remove bolts (#8) from back of tongue (#5).
b. Attach middle of tongue to hitch (#2) with two
3/4"-10 x 3 1/2" GR5 cap screws (#9), one 2" lg.
spacer (#2) and two 3/4" flange lock nuts (#14).
IMPORTANT: The tongue (#5) should be as near
level as possible when pulling the roller over soil.
Before proceeding, determine which hitch assembly
below to use that will mount the tongue near level.
Use hitch assembly in Figure 1-2 to mount
tongue (#5) if tractor drawbar is lower than 13"
Use hitch assembly in Figure 1-3 to mount
tongue (#5) if tractor drawbar is 13" or higher.