Locating the Steam Generator
The steam generator must be installed upright and level. The steam generator must be located within a 25 foot
maximum steam line run to the steam head AND within the 25 foot control wire length to any controls. It may stand
attached to a horizontal base or to a wall. For wall mounting, use “keyhole” slots on a cabinet back to slip over screw
heads and install a wood cleat or shelf to the wall at the bottom of the unit to help support the bottom. Add a cleat at
the top to keep the unit in place.
Install the steam generator indoors only and in a dry location that will not be subject to freezing. If exposure to
freezing can not be avoided (e.g., seasonal-use homes), the optional automatic tank drain down valve must be
installed. Turn off the power and water supply to the unit if it will not be used for an extended period of time.
Room Construction and Ventilation: Important
The room in which the steam generator is to be located must be constructed of materials that can withstand excessive
amounts of moisture and condensation. Large amounts of steam can be released into the room when the enclosure
door is opened. Providing natural or forced ventilation of the room will help maintain comfort and minimize moisture
damage to the building. Jacuzzi Whirlpool Bath is not responsible for damage resulting from excessive moisture.
Consult an architect or engineer for aid in designing your room structure.
INSTALLATION
HEATED ATTIC
STEAM
ENCLOSURE
ADJOINING
CLOSET
BASEMENT
INSIDE VANITY
OR CABINET
3