18
11.Drill a 3/32" diameter hole into the top ring at about 15°.
(See Illustration 20.) Engage the top of the fixed panel
with the top ring groove. Secure the top of the fixed
panel to the top ring. (See Illustration 21.)
12.Plumb and square the tower. Mark a point through each
slot of the wall bracket. Drill two (2) 3/32" diameter holes
in the top ring through the slots of the bracket. (See
Illustrations 22.) Secure the top ring to the wall bracket.
ILLUSTRATION 20
ILLUSTRATION 21
IMPORTANT:
MUST DRILL AT 15°
ANGLE TO AVOID
DRILLING THROUGH
ROLLER TRACK.
H9
15°
ILLUSTRATION 22
FLAT PORTION
OF TOP RING
DRILL TWO (2) 3/32"
DIAMETER HOLES
SCREW (2)
WASHER (2)
FLAT WASHER
#8 TYPE B
STAINLESS STEEL
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
H9
DRILLING TOP RING
DRILLING TOP RING
RING TO BRACKET
ROLLER
TRACK
TOP
RING
GROOVE
FIXED
PANEL
H5
H9
H5
M3.5X9.5MM
STAINLESS STEEL
SCREWS
QTY.-2
H9
LOCATED IN HARDWARE KIT
IMPORTANT:
MUST DRILL AT A 15°
ANGLE TO AVOID
DRILLING THROUGH
ROLLER TRACK OF
TOP RING.
15°
1/8"
O
U
T
S
I
D
E
WASHER
QTY.-2