4 MHD56109 - Edition 9
INSTALLATION
Prior to installing hoist, carefully inspect it for possible shipping
damage. Hoists are supplied fully lubricated from the factory.
Ensure load chain is lubricated prior to hoist operation.
CAUTION
• Owners and users are advised to examine specific, local or
other regulations, including American National Standards
Institute and/or OSHA Regulations, which may apply to a
particular type of use of this product, before installing or
putting hoist to use.
The SLB lever chain hoist can be used in any position provided it
is rigged to pull in a straight line from top hook to bottom hook.
The hoist body must be positioned so that it does not contact the
load or support members when in use. Ensure hand lever
movement is unrestricted.
When operating in limited areas suitable lifting attachments or
slings must be used to prevent hoist body and hand lever from
being obstructed.
CAUTION
• Ensure hoist top and bottom hooks are properly rigged and
hook latches are engaged, prior to use.
Initial Operating Checks
Operate hoist with a test load (10% of rated capacity) by raising
and lowering this load several times. Verify brake operation by
lowering same load to check load does not slip when lowering
stops.
NOTICE
• Each time a load is lifted, operation of load brake should be
checked by raising load slightly and stopping to ensure brake
will hold load before continuing to lift load.
(Dwg. MHP0830)
Familiarize operators and personnel responsible for hoist
installation and service with ASME B30.21 specifications and
this manual prior to placing unit into service. All requirements of
this specification, including testing should be met before
approving hoist for operation.
OPERATION
The four most important aspects of hoist operation are:
1. Follow all safety instructions when operating hoist.
2. Allow only personnel trained in safety and operation of this
hoist to operate hoist.
3. Subject each hoist to a regular inspection and maintenance
procedure.
4. Be aware of hoist capacity and weight of load at all times.
WARNING
• The hoist is not designed or suitable for lifting, lowering or
moving persons. Never lift loads over people.
Positioning Unloaded Hook (Neutral Position)
Refer to Dwg. MHP0830 on page 4.
Check that chain stopper (54) is securely fastened in last link of
load chain anchor end. The load chain stopper is intended to
prevent load chain from becoming disengaged from hoist and is
not intended to support the load.
Specifications Table
Model
No.
Capacity
(metric tons)
Lever Pull to lift
rated load (kg)
Load
Chain size (mm)
Wt. of chain per
0.3 m of lift (kg)
No. of chain
falls
Hoist Net Weight
with standard
1.5 m of lift (kg)
SLB150 3/4 18.5
6 x 18 0.24
1
7.03
SLB200 1 27
SLB300 1-1/2 24 7.1 x 21.2 0.34 11.0
SLB600 3 24
10 x 30
1.66 20.0
SLB1200 6 26 1.32 2 30.4
To p Hook
Free Knob
Selector Lever
Load Chain
(Hook side)
Bottom
Hook
Hand Lever
Load Chain
(Anchor side)
Hook Latch
Chain Stopper