108604 10/08 4-13
Pump Belt and Pulleys Installation
NOTES:
1. Torque to 45-48 ft-lbs.
2. Torque to 12-15 ft-lbs.
3. Apply grease at zerk (see owners manual).
4. Do not torque Item 18 (NT .750-10 HX NL ZN), Item 15 (349761 Pump
Idler Arm) should pivot freely.
5. Electric clutch burnishing procedure: After installing a new clutch it is
important to burnish the clutch to insure maximum deck clutch life. In an
open area with no bystanders set the engine speed to half throttle. Cycle
the deck clutch on for 15 seconds, and then off for 15 seconds. Repeat
this operation 10 times, it will require about 5 minutes to complete.
ITEM
NO.
SERVICE
PART NO.
MFG.
PART NO.
QTY DESCRIPTION
1 601462 601462 1 ENGINE PULLEY
2 212076 212076 1 KEY 1/4 SQ X 1.50 LONG
3 601311 601311 1 WARNER CLUTCH
4 783829 783829 1 FW .460 X 1.750 X .250 ZNYC
5 785659 785659 1 CS .437-20 X 2.50 HX G5 ZNYC
6 083196 083196 4 SS .312-18X .750 SQ-HD ZN
7 601461 601461 2 PULLEY BDP-21
8 783712 783712 2 KEY FOR BDP21L
9 791251 791251 1 CLUTCH PIGTAIL HARNESS WITH DIODE
10 008193 008193 2 NT .500-13 HX G5 ZNYC
11 767962 767962 4 FW .531 X 1.063 X .090 SAE HD ZN
12 016527 016527 2 CS .500-13 X 1.00 HX G5 ZNYC
13 366765 366765 1 CLUTCH ANCHOR ANGLE
14 784918 784918 2 RUBBER BUMPER
15 349761 349761 1 PUMP IDLER ARM
16 015495 015495 1 STRAIGHT GREASE FITTING
17 025296 025296 1 FW .760 X 1.625 X .08 ZN
18 061101 061101 1 NT .750-10 HX NL ZN
19 781856 781856 1 IDLER PULLEY
20 028118 028118 1 FW .62 X 1.00 X.134 ZN
21 781872 781872 1 CS .625-11 X 1.50 HX G5 ZN
22 601016 601016 1 IDLER SPRING
23 601463 601463 1 A-SEC PUMP IDLER BELT
24 036236 036236 1 CS .312-18 X 1.00 HX G5 ZNYC
25 768523 768523 2 FW .343 X .687 X .051/.080 HD ZNYC
26 034272 034272 1 NT .312-18 HX G5 ZNYC
27 797654 797654 1 FW 1.156X1.750X.250 ZY